Plastic Injection Mold Testing Steps
1)Preparation: Complete the mold fabrication, choose the right inietion machine and materials according the requirments
2)First Trial: Set different parameters to check defects and adjust it to have a good sample for customers.
3)Adiust and Optimize: QC checking after 24 hours and and mold modification to improve the issues.
4)Second Trial: Reset the second mold testing and check product quality (appearance, accuracy, ejection).
5)Sample Confirmation: Finalize samples and document production conditions.
6)Moldshipment & Maintenance: Once optimized, we will ship the mold to customers for mass production.