With a circular runner as possible.
Runner section diameter at least 1mm bigger than the product thickness on the gate area.
Main runner diameter should be 20% bigger than the secondary runner diameter at least.
Multi-cavity mold runner must be balance design
The common runner with 400 # sandpaper polishing at least; Using 600 # sandpaper polishing for the mirror polishing product runner at least.
There should be slug and venting at the end of the injection mold runner.
Trapezoidal runner requirements as below:

Sprues,runners and gates fulfill the function of conveying the plastics melt from the nozzle of the injection unit to the individual cavities. While it is true that they may be reused in the form of regrind, their presence nevertheless means a reduction in the performance of the injection molding machine inasmuch as they must be plasticated in the barrel. With smaller parts,they may account for 50 % or more of the actual shot weight. 
A) Surface Runner and gate Design Standards
1) Deep Mould doesn't specify runner or gate size/configuration without a part 3D drawing and part surface treatment requests. For complicated plastic parts we will make moldflow analysis which performed by a reputable source and close documented communication with the Customer. Unless clearly documented on the mold quotation and agreed to by Deep Mould, the Customer will specify the runner and gate size/configuration and be responsible for part production cycle times.
2) Trapezoidal runners are preferred due to ease of machining and design. Full round runners are acceptable and common, and are necessary with some material types. All runner intersections will have radii added in the direction of flow and have cold slugs at each intersection.
3) Edge gate designs are to be the “double chisel” type that can easily be detached from the part. Refer to drawing S3-2 for edge gate design guidelines.
4) Fan gates are commonly used to assist in reducing part warp or to maintain flatness. Refer to drawing S3-3 for fan gate design guidelines.
5) Sub-gate designs vary, and should be addressed on an individual basis. Refer to drawing S3-4 for sub-gate design guidelines.
6) Tunnel (“Cashew”) gates can only be used with specific material types. Refer to drawing S3-5 for “Cashew” gate design guidelines.
7) Runner shut-off inserts will be the DME “MRS” Type. When the DME “MRS” Type is not useable, refer to drawing S5-6 for an alternative custom design.
B) Hot Runner Design Guidelines

1) The Customer will specify the Hot Runner Supplier. Husky, Incoe, Mold Masters, DME, and Synventive are the preferred Hot Runner suppliers at UPmold. Any Hot Runner suppliers not listed must be approved by the Engineering Manager and specified by the Customer. Deep Mould will make flow channel, nozzle type, or gate size/configuration with a MOLD FLOW ANALYSIS performed by the hot runner supplier or by a reputable source and close documented communication with the Customer. Unless clearly documented on the mold quotation and agreed to by UPmold, the Customer and hot runner supplier will specify the flow channel, nozzle type, and gate size/configuration and be responsible for part production cycle times.
2) All manifold pocket and nozzle-well machining tolerances as specified by the Hot Runner supplier will be adhered to by Deep Mould.
3) Temperature control of at the nozzle well/gate detail is critical. Water is to be designed as close as possible to the nozzle well/gate without compromising the surrounding steel. Consider water jackets in all designs as the mold quotation allows (refer to drawing S3-7). Provide a cooling baffle opposite the gate, preferably on a separate cooling circuit.
4) In cases where nozzle cleaning is necessary in the molding press, the system will be designed with parting line accessible S.H.C.S. to disassemble the hot runner system plate assembly as shown in drawing S3-7. Guide pins must be longer than the Nozzle tips to protect the nozzle tips during assembly/disassembly of the “hot half”.
C) Three Plate Runner and Pin-Point Gate Design Standards
1) DME Three plate extension bushings will be used.
2) Trapezoidal runner configurations are preferred. Deep Mould will make runner or pin-point gate size/configuration with a MOLD FLOW ANALYSIS performed by a reputable source and close documented communication with the Customer. Unless clearly documented on the mold quotation and agreed to by UPmold, the Customer will specify the runner and pin-point gate size/configuration and be responsible for part production cycle times.
3) Pin Point gates need to be designed so that the gate will break off at the desired location. A gate indent (spherical radius detail) is needed to allow for the vestige “carrot” left at the part surface. Refer to drawing S3-8 for details.
4) Sucker Pin design and location is critical, and the design is very dependent on the plastic material specifications.