Molding cycle
Leave a message
The time required to complete the injection molding process is called the molding cycle, also known as the molding cycle. It actually includes the following parts: molding cycle: molding cycle directly affects labor productivity and equipment utilization. Therefore, in the production process, we should ensure the quality of the premise, as far as possible to shorten the molding cycle of each relevant time.
In the whole molding cycle, injection time and cooling time are the most important, they have a decisive impact on the quality of products. The filling time in injection time is directly inversely proportional to the filling rate. The filling time in production is usually about 3-5 seconds.







